Home
|
About Us
|
Careers
|
Contact Us
|
Find a Rep
|
Industry Links
|
News
|
Rep Login
Customer Solutions
By Market
Education
Government
Hospitality
Healthcare
Industrial
Office
Hi-Tech
Retrofit
Other
By Product
Chillers
Chiller Plants
Custom Packaged DX
Replacement Rooftop
Water Source Heat Pumps
Green Design
Indoor Air Quality
Acoustics
Energy Efficiency
LEED
Literature
Innovation
Technology
Applications Expertise
Testing and Verification
Software
Evaporative Condensing
Waterside Economizer
Geothermal
Controls
Cabinet Design
Compressors and Refrigeration Technology
Fans
Coils
Filtration
Products
Chillers
Air-cooled
Water-cooled
Evaporative Condensing
Chiller Plants
Custom Packaged DX
Ultraline
Penthouse DX
Replacement Rooftop Systems
Retrofit Solutions
Vertical Self-contained Systems
V-Cube
V-Cube Slim
Water Source Heat Pump Systems
Quick Reference Guide
High Efficiency and IAQ Vertical (2 to 6 tons)
High Efficiency Vertical (1 to 6 tons)
Vertical (1 to 5 tons)
High Efficiency Horizontal (½ to 6 tons)
Horizontal (¾ to 5 tons)
Twin Circuit Horizontal (7 to 12 tons)
Twin/Quad Circuit Vertical (7 to 24 tons)
Water-to-Water (5 to 40 tons)
Dedicated Outdoor Air System (Up to 5500 CFM)
V-Cube Slim (15 to 70 tons)
What's New
Search
Customer Solutions
>
By Product
>
Chiller Plants
Customer Solutions
By Market
By Product
Chillers
Chiller Plants
Custom Packaged DX
Replacement Rooftop
Water Source Heat Pumps
Chiller Plants
Avid Technologies – Burlington, MA
Chiller Plant System
Avid develops production software used in demanding, high-end projects such as the soundtrack editing for Avatar, the visual effects editing for the movie Star Trek and the on-tour production needs for Grammy Award-winning band Maroon 5.
Required additional cooling for in leased facility for R&D labs and data center.
System includes and energy saving 500-ton magnetic bearing centrifugal chiller along with an evaporative condenser and waterside economizers.
Meets desire for a totally self-contained system with pre-commissioned, plug-and-play operation, lower electrical demand, sole source responsibility and portability if the facility is vacated.
Read our case study
(PDF)
Auraria Science Building, Denver, CO
WEBCO™ Chillers
New four story, 197,000 square foot science building addition designed with an emphasis on sustainability on the University of Colorado Denver campus.
Campus will be pursuing LEED certification.
100-ton WEBCO chiller – paired with Governair
®
air handlers – uses 3 evaporative condensers, 3 evaporator barrels, and 9 screw compressors in a variable primary pumping system.